Commissioning begins by thorough inspection of the HVAC equipment. Then we will thoroughly document all of the operating systems every step of the way from start up and sequence of operation to shut down.

Commissioning a commercial HVAC system begins with a visual inspection of all components of the equipment and materials to verify that everything has been installed and in the proper location, per design specifications. The next step is to turn on all equipment to verify that the system starts up according to the manufacturer’s specifications. Last is testing the equipment by using scenarios designed to make sure the system will operate as expected, reacting appropriately to changing conditions in the building’s environment. Testing can be time-consuming but is critical for efficient operation and guaranteeing customer satisfaction.

Three Main Types of Commissioning

Commissioning. Testing a brand-new HVAC installation within a new or existing building to verify that it meets the designer’s and/or owner’s specifications.

Recommissioning. Testing an HVAC system that was commissioned in the past to verify that it is still performing efficiently. It may include making repairs or any needed upgrades in order to meet ASHRAE, PECIand ACG codes and standards as well as the owner’s needs.

Retro-commissioning. Testing the HVAC system of an old building that was repaired and upgraded rather than replaced, to verify that it meets the designer’s and/or owner’s requirements.

The Process of Commissioning

Verify Proper Installation

Verifying proper installation begins with an inspection to make sure that the correct equipment and materials have been installed and in the proper location, determining whether the installation meets construction specifications and requirements and creating documentation of all equipment installed.

Initial Start-Up of System

When starting the equipment for the first time, it is very important to follow the startup checklist detailed in the manufacturer’s documentation for each piece of equipment in the system. It is possible to void the manufacturer’s warranty if the initial startup steps are not performed properly. The process of startup, shutdown and the sequence of operation must be carefully documented. Notes are made of any instances of improper operation during this process and reported to the appropriate contractor.

After the startup, shutdown and operation sequence have been verified to work properly and are fully documented, then testing, adjusting and balancing can begin.

Testing, Adjusting and Balancing

The airflow requirements for each air device are tested per the mechanical plan sheet. If no mechanical plan sheet is available, such as for a retro-commissioned HVAC system, balancing the unit per industry standard will be needed.

The initial conditions of the HVAC system are thoroughly documented. This includes testing motors, voltage and amperage, taking flow measurements, adjusting fan motor speed, etc.

Once the outside air and exhaust fans have been balanced, the building pressure is measured. This is a very important factor for the comfort of personnel and the public.

One of the last steps involves simulations of various environmental conditions in the building to verify that the equipment will react appropriately, making sure that when the same conditions occur the system adjusts properly and consistently. If results are not consistent, troubleshooting must be done to determine the reason and fix it.

A commissioning professional must be able to design a commercial HVAC system with all the bells and whistles necessary to meet the requirements of the design specifications, know the products available to design the proper system and test the system prior to going active. They must know all of the new ASHRAEcontrol strategies, PECI and ACG codes and standards. They also need to be aware of other relevant requirements, such as U.S. Green Building Council LEED requirements, as well as state, national and international construction codes.

It is important that all designers, contractors and manufacturers work together to make sure that the system performs exactly as it should, from the basic duct joint through the programming and design of the components.

The Benefits of Commissioning a Commercial HVAC System

In a commissioned HVAC system, the equipment will have been shown to meet all of the new standards, green building, state and national codes for maximum efficiency. Commissioning ensures that the system meets the owner’s needs and the project requirements.

Commissioning a building is very important for ensuring owner satisfaction and energy efficiency, but it is an often-neglected part. When a system has not been commissioned, there is no proof that it will work satisfactorily; and once the work is deemed complete, the owner is responsible for anything that was not actually completed properly.

Commercial HVAC commissioning is an important part of the health and functionality of an HVAC system, particularly after it’s been installed. The term ‘commercial HVAC commissioning’ may have several different meanings, but basically, it refers to an exhaustive analysis and repair of a building’s current commercial HVAC systems.

The goal of commissioning is to ensure a facilities’ HVAC system is operating at peak efficiency. This is why it’s very common after installation or several years after construction. Most of the time, commercial HVAC commissioning begins with a comprehensive review of the state of the HVAC systems and ends with HVAC repair to achieve the facilities’ desired performance levels.

What Types of Commercial HVAC Commissioning are There?

Commercial HVAC systems can break down or run into recurring problems at just about any point of their lifecycle, depending on what’s causing the problem. In this way, there are different types of HVAC commissioning services. The main three include:

  • Post-Construction Commissioning:

    this type of HVAC commissioning involves systems that are under a year old. Typically, they were improperly installed or started up by an inexperienced contractor or engineering team, resulting in poor HVAC system performance.

  • Re-Commissioning:

    this type of HVAC commissioning involves systems that are over a year old. Re-commissioning could be needed for a variety of reasons. Usually, the system is either old and not running properly, or it was never running correctly at all.

  • Recurring Issue Resolution:

    for comfort, airflow, sound or performance issues that occur on a regular basis, this type of HVAC commissioning seeks to fix recurring problems. After a full system inspection, necessary equipment repair and replacement gets HVAC systems back to their peak performance levels.

These three types of HVAC commissioning services span the entire lifecycle of an HVAC system and have custom-tailored solutions depending on the age, health, and performance of all systems.

Whether your commercial HVAC system is new or old, running well or not, commissioning services can help building owners create a comfortable indoor environment, cut costs through energy efficiency, and rectify mistakes that led to poor HVAC performance.